2nd Floor Carrel Replacement

We are very pleased to announce that the old plastic carrels on the 2nd floor of the Library will be removed Friday September 23rd and Monday September 26th. New open carrels and comfy chairs with built in tablets (similar to the new chairs on the ground floor) will be installed Tuesday September 27th. Electrical outlets are also being installed near the new carrels and chairs.

There will be noise on the 2nd floor of the Library while the old carrels are being removed and the new carrels are installed. We apologize in advance for any inconvenience this will cause.

Please do not hesitate to contact me if you have any questions or concerns.

Monique Flaccavento (monique.flaccavento@utoronto.ca),
Acting Director, OISE Library

About Monique Flaccavento

Acting Director, OISE Library
This entry was posted in Library Spaces, Uncategorized. Bookmark the permalink.

Leave a Reply