Construction February 24, 2017

Carpeting will be removed from the Ground Floor Storage Room in the OISE Library between 2 and 5pm February 24th. This will cause some noise on the Ground Floor of the Library. The new periodicals area will be closed during this time and will be used for the chairs, baffles, and other equipment currently in the Storage Room.

New tiles will be installed in the Ground Floor Storage Room after the Library closes February 24th. As a result, there may be a lingering glue smell in the Library for the next few days.

We apologize for any inconvenience this will cause.

Please do not hesitate to contact me if you have any questions or concerns.

Sincerely,

Monique Flaccavento (monique.flaccavento@utoronto.ca),
Acting Director, OISE Library

About Monique Flaccavento

Acting Director, OISE Library
This entry was posted in Library Spaces. Bookmark the permalink.

Leave a Reply